Saturday, March 9, 2013

Irrigation Main Line

This week we experienced a main line failure in #18 Fairway.  Due to the main line position and how deep it was located in the ground (over 4 feet) a large hole was dug out for the repairs.  We were able to complete the repair Friday and the area will continue to dry and level following a few topdressing applications.


Above, is the failed coupler that caused the 6" Main Irrigation Line to leak.



In this picture the two new couplings are positioned with new 6" pipe to complete the repair.  We drove rebar in the ground around the fittings to ensure they would not move when the irrigation pipe flexes during normal operation.

Following the repair the hole was filled back in and compacted.  The sod will be level over the next two weeks by topdressing with green sand.  This will encourage the area to recover and provide a smooth surface moving forward.