Our Scheduled Aerifications are; May 27th-30th, July 7th-11th, and August 4th-8th. The practices performed during these dates are very important and are planned in accordance with the growing conditions of the turf. The turf needs to be vigorous and capable of growing at a healthy rate in order to recover from the processes that follow.
GREENS:
• Verticut Greens
• Topdress Greens with Sand
• Disrupt 30% of the Surface area through Core Aerification Annually
• Brush sand to fill in holes
• Roll with a 2-ton Roller
• Brush and Blow for the best presentation possible
TEES & APPROACHES
• Topdress with sand
• Core Aerify
• Drag cores and clean-up debris
• Roll with 2-Ton Roller to smooth the surface
FAIRWAYS
• Circle-cut to manage grain
• Core Aerify
• Drag cores and clean-up debris
Below is our recently purchased Toro Procore 1298, a Fairway Aerification Unit, providing a significantly improved process in the fairways.