The Goal of our Aerification Program is to impact 10% of the Tif-Eagle Putting surface. Additionally, Core aeration of Tees, Approaches, and Fairways were completed. Our staff aerified an average of 13 Acres a day in conjunction with multiple mowing schedules and clean-up processes.

To begin, we verticut the Greens 4 times followed by 2 mowings to clean-up. |
|
 |
The Toro ProCore 648 aerifies and collects the material. |
 |
Material that was collected from #16 Green. This material needs to be removed by hand and is very labor intensive. |
 |
We purchased this Toro ProCore 1298 to complete the fairway aerification program. Additionally, we used 2 Toro ProCores to aerify around the drains, yardage plaques, and irrigation heads to assist in the fairways. |
Rain slowed down the clean-up processes on Thursday and Friday. This extended our clean-up efforts through Saturday 5/31. Currently, 14 days Post Aerification, the course is recovering very well and is in very playable condition.